OLAWUYI RACETT NIGERIA LTD.,
OX1 2JD,
POWER INDUSTRY

 

  1. POWER OPTIMIZATION SOFTWARE BY OLAWUYI RACETT NIGERIA LTD. OX1 2JD

 

  • The Power Optimization Software is a software that was designed to improve the Electricity Generation, Transmission and Distribution in a Country.
  • The Power Optimization Software allows users to input the daily energy generated by each generating station in the Country. It then performs Power Generation, Transmission, and Distribution Analysis for the Entire Country.
  • Based on the Daily Energy generated by the Generating Stations, the software automatically calculates and deducts the Power Transmission Loss in transporting the electricity from the Generating Stations to the Distribution Centers.

 

  • The Total Power available for distribution is then shared to the  Distribution Centers. The Distribution Losses incurred by each Distribution Center is deducted and the net available power is used for Distribution Analysis.
  • The Distribution Centers divide their net available power between their member states, based on the State Population and using Electricity Consumption per Capita.
  • The software automatically calculates the electricity demand required by each state, then compares this with the power distributed to each state for the day. The total number of hours of electricity that can be derived from the power supplied is calculated and this is used to automatically determine which hours of the day the state will be supplied electricity.
  • The software enables citizens to know at what time of the day they can expect to receive electricity in any location in the country.

 

  • THE SOFTWARE HELPS PLAN THE INSTALLATION OF NEW GENERATING STATIONS IN A COUNTRY

 

  • For Each State in the Country and its Capital City, the software enables the country to know:
    • The type of Generating Station (Solar, Hydro, Wind, Gas, Oil, Nuclear, or Coal) that can be installed.
    • The minimum amount of funding that would be required to build, manufacture and install the New Generating Station.
    • The Effect of the New Generating Station on the amount of hours of Electricity supplied to a State. The effect is dependent on the Desired Power (MW) of the New Generating Station

 

  • In Nigeria, for each of the 36 States and the Country’s Capital, the software calculates the number of hours of Electricity that will be available for distribution within the State.

 

  • The Power Optimization Software Automates the Power Industry in a Country.
  • OLAWUYI RACETT NIGERIA LTD. OX1 2JD currently has the software working for the United States, the United Kingdom, and for Nigeria.

 

OLAWUYI RACETT NIGERIA LTD. OX1 2JD, UK, HAS FILED THE USA PATENT FOR THE POWER OPTIMIZATION SOFTWARE IN 2022.